St. Louis County · Missouri

Roofing in Wildwood, Missouri

What it actually takes to re-roof a house in Wildwood — whether the city wants a permit, which code edition applies, who to call at the building department, and how old the housing here really is. No sales copy dressed up as local knowledge.

Permit for a re-roof
Not published
St. Louis County
Adopted code
Not published
Set locally, not by the state
Homes here
12,918
Housing units
Design wind
115 mph
Vult, metro-wide

Roofing in Wildwood

Wildwood runs to about 66.68 square miles and roughly 35,417 people. It sits about 25 miles west of downtown St. Louis. There are around 12,918 housing units here, and every one of them has a roof with a clock on it. The community dates back to 1995. We cover ZIP codes 63038, 63040, 63005, 63011, 63021, 63025 and 63069.

We have not logged a completed roof in Wildwood yet. We would rather say so than put a number on this page that is not real.

The housing stock in Wildwood

Wildwood incorporated in 1995 by consolidating eleven historic unincorporated hamlets (Melrose, Hollow, Orrville, Westland Acres, Kelpe, Monarch, Glencoe, Pond, Fox Creek, Grover, Centaur — per the Wildwood Historical Society), so its housing mixes large-lot newer subdivisions with older pockets in those former hamlets.

We work across Wildwood rather than one corner of it — Melrose, Hollow, Orrville, Westland Acres, Kelpe, Monarch, Glencoe, Pond, Fox Creek and Grover included. Age and construction change between them, sometimes by thirty years and a whole different framing method, which is why we look before we quote rather than after.

The Big Chief Restaurant, a remnant of a 1928 Route 66 tourist complex, was added to the National Register of Historic Places in 2003, but it is an individual listing rather than a district.

Do you need a permit here?

Wildwood does not publish a clear answer either way on whether a like-for-like roof covering replacement needs a permit. We confirm it with the department before we start, every time, and we pull whatever is needed as part of the job. We would rather write that here than guess on your behalf.

Which code Wildwood enforces

Wildwood has not published the edition it currently enforces anywhere we could verify, so this page does not name one. Editions across the metro run from the 2006 IRC to the 2024 IRC, which is a genuinely wide spread — worth asking your contractor which one they are building to.

Permits and inspections in Wildwood

The department's own number was not retrievable from an official source when this page was built, so we are not printing one. Wildwood does not publish the building official's name, so this page does not name one. Plenty of sites will show you one anyway. The department page is here.

Worth knowing in WildwoodCity Code Section 500.010 authorizes the Mayor to execute an agreement with St. Louis County for 'permits, inspections, licensing and approval of plans.' Homeowners and roofers in Wildwood therefore deal with St. Louis County Public Works, not the city.

Permitting is on us, not on you.

The design figures behind the spec

Unlike some states, Missouri does not assign each municipality its own wind and snow numbers — these are metro-wide.

CriterionFigureWhat it drives
Ultimate design wind (Vult)115 mphFastener schedule and the manufacturer wind rating we specify
Nominal design wind (Vasd)89 mph (derived, not published locally)The allowable-stress figure older specs quote
Ground snow load20 psfStructure, and how much the eaves hold in a freeze-thaw
Frost depth30 inFootings, not roof covering
Seismic design categoryC residential / D commercialLateral bracing and structural connections — not shingles

What each of these actually does to a roof, why New Madrid does not change how shingles go on, and the difference between the code minimum and the manufacturer minimum on nails per shingle, are all in the St. Louis roofing code guide.

Nearby

Wildwood borders Chesterfield, Clarkson Valley, Ellisville, Eureka, Pacific and Franklin County. These are the ones we also cover, each with its own permit rule and code edition:

Elsewhere in St. Louis County we also cover:

How Wildwood compares with the rest of St. Louis County

Missouri sets none of this at state level, so a specification that was right one municipality over is not automatically right here.

CityPermit for a re-roofAdopted codeBuilding dept.
AfftonYesNot published314-615-5184
BallwinYes2015 I-Codes (2024 I-Codes proposed for 2026)636-227-2129
BrentwoodNot published2024 IRC314-963-8602
ChesterfieldNot published2015 IBC / 2015 IRC636-537-4000
ClaytonNot published2021 IRC314-290-8463
Creve CoeurNot published2009 IRC314-872-2500
Des PeresNot published2018 I-Codes314-835-6100
EllisvilleNot published2015 IRC636-227-9660
EurekaNot published2018 IRC
FlorissantNot published2021 IRC314-839-7648
KirkwoodNot published2021 IRC314-822-5823
ManchesterNot publishedNot published314-615-5184
Maryland HeightsYes2021 IRC314-291-6550
MehlvilleYesNot published314-615-5184
OakvilleYesNot published314-615-5184
Richmond HeightsNot publishedNot published314-646-7658
Unincorporated St. Louis CountyYesNot published314-615-5184
Town and CountryYes2018 I-Codes (2024 I-Codes pending)314-587-2820
University CityNot published2018 IRC
Webster GrovesNot published2015 IBC family314-963-5300

Get a straight answer on your roof

Free inspection, a written scope, and photos you keep either way.

Common questions about roofing in Wildwood

Do I need a permit to replace a roof in Wildwood?

Wildwood does not publish a clear answer either way. We confirm it with the building department before starting and pull whatever is required.

Have you worked in Wildwood before?

Not yet. We have no completed roof logged in Wildwood, and we would rather say so than put a number on this page that is not real.

Does Missouri license roofing contractors?

Missouri has no state-level roofing contractor licence. Licensing and registration are imposed municipally, and several St. Louis metro cities require it. Illinois does licence roofers statewide, so a contractor working the Metro East needs an IDFPR roofing licence.

Permit and code details for Wildwood come from the jurisdiction's own published pages and codified ordinances. Population, housing and neighbourhood detail come from census data and the sources below; housing-age figures are ACS-derived medians republished by housing-data services, so treat them as approximate. Sources: ecode360.com · www.cityofwildwood.com · en.wikipedia.org · wildwoodhistoricalsociety.org · www.cityofwildwood.com · www.city-data.com. Municipal staffing, phone numbers and adopted code editions change — confirm with the jurisdiction before relying on anything here.

Call [PHONE] Free Inspection